December 27 , 2025
16 hrs 0 min
28
- Unit-2 of the Subansiri Lower Hydroelectric Project, with a capacity of 250 Megawatt, was commissioned in Arunachal Pradesh.
- The Subansiri Lower Hydroelectric Project has a total installed capacity of 2,000 Megawatt with eight units of 250 Megawatt each.
- It is the largest hydropower project in India and is located in the North-East region.
- The project is a run-of-the-river hydropower scheme built on the Subansiri River.
- The project has the largest dam in North-East India, with a height of 116 metres.
- The dam also helps in flood moderation to reduce flood risk in downstream areas.

Post Views:
28