The National Highways Authority of India (NHAI) created four Guinness World Records during the construction of the Bengaluru–Kadapa–Vijayawada Economic Corridor (NH-544G) near Puttaparthi, Andhra Pradesh.
NHAI laid longest continuous bituminous concrete (BC) laying of 9.63 km on a three-lane stretch and for laying the highest quantity of BC (10,655 metric tonnes) in 24 hours.
Two more records were set for the continuous laying of 57,500 metric tonnes of BC and for paving a 52 km long three-lane stretch without interruption.
This 343 km, six-lane corridor access-controlled highway connecting Karnataka and Andhra Pradesh.